For projects requiring precision and durability, our Used 5.5m TBM offers a proven track record. From urban metros to mountain passes, we have the technology to get the job done.
Safety is integrated into every component, from the ergonomic operator cabin to the automated fire suppression and emergency evacuation systems.
Designed specifically for the challenges of District Heating, our equipment ensures watertight linings and stable excavation faces.
Our global logistics network ensures that your Used 5.5m TBM and essential components are delivered to your site in India on time and within budget.
For more information on our Used 5.5m TBM, please contact us or visit Tunnel-Boring.com.
last:used-5-0m-tbm
next:used-6-0m-tbm