Back to News
9/30/2026

Screw Conveyor Wear Management for EPB TBMs in Southeast Asia's Karst Ground

For EPB TBMs boring the soft, water-rich and karstic ground now common across Southeast Asia's metro and rail programmes, the screw conveyor is often the first component to reach its wear limit. Abrasive sands, gravels and mixed-face transitions grind at the screw shaft, flights and casing liners, while humid conditions accelerate corrosion on exposed steel. Once clearance opens up, muck control and face pressure stability degrade — long before the screw itself actually fails.

Effective wear management starts with a baseline: measure flight thickness and liner wear at set intervals, log muck condition, discharge rate and screw pressure, then correlate those readings with the ground type in the face. Hardfaced flights and replaceable wear-resistant liners let crews renew only the high-wear zones instead of scrapping the shaft. Planned replacement windows, scheduled alongside cutter and segment bolt checks, stop a worn screw conveyor from becoming an unplanned stoppage underground.

For buyers, the decisive factor is spares availability. Sourcing screw shafts, flights, liners, seals and hydraulic parts factory-direct from the Deyang TBM cluster in Sichuan removes intermediaries and typically delivers in 2–4 weeks, so a planned change-out stays planned. OUSUN supplies interchangeable screw conveyor parts alongside disc cutters and new or refurbished EPB machines — review your wear spares list at tunnel-boring.com or [email protected] before the next drive.